Myrtle Beach Online - News, Sports & Entertainment from The Sun News
Myrtle Beach Online's Mug Shots Index Career Builder
Search for

Web Search powered by YAHOO!
News - Associated wire stories

Friday, Aug. 26, 2011

All F-35 fighter jets grounded due to power system problems

- The Fort Worth Star-Telegram
email this story to a friend E-Mail print story Print 0 comments
Text Size:

tool name

close
tool goes here

For the third time in less than a year, the Pentagon has grounded all F-35 joint strike fighters because of a mechanical problem.

The 20 operational test and training aircraft were ordered parked Wednesday until engineers and technicians can find why a power system that starts and cools the aircraft failed during an engine ground test Tuesday at Edwards Air Force Base in California.

Suspending flights "is the prudent action to take at this time until the F-35 engineering, technical and system safety teams fully understand the cause of the incident," the F-35 Joint Program Office said in a statement. The program office oversees contractors and military test teams.

Similar stories:

  • Pentagon restricts F-22 flights, safety a concern

  • Boeing sees 787 check slowing work while delivery goal met

  • Jet not ready for its debut

  • JetBlue pilot's rant puts focus on medical exams

  • Tiny Guinea-Bissau has big role in drug smuggling, and seems likely to keep it

Few details of the incident were released, but the program office said that once the power system failed "the engine was immediately shut down and the jet was secured. No injuries to the pilot or ground crew occurred."

In March, all 12 test planes then flying were grounded until engineers could sort out why a dual electrical power generator failed in flight, creating a hazard. Some planes were released to fly within a week and the rest after two weeks, after the problem was tied to improper maintenance.

In October, planes were grounded for a week because of a software problem that could shut down fuel pumps in flight.

The system that failed this week, the integrated power package, was on the same plane whose electrical generator failed in March. The power system is used to start the main jet engine, provide air conditioning for the cockpit and numerous electrical systems, and generate backup electrical power.

Lockheed Martin spokeswoman Laurie Quincy referred questions to the program office.

Lockheed is the prime contractor on the F-35, the Pentagon's costliest weapons program ever. The F-35 development effort, based in west Fort Worth, has come under intense scrutiny in recent years from Pentagon leaders and Congress because of numerous delays and cost increases.

To read the complete article, visit www.star-telegram.com.

Subscribe to The Sun News Print Edition
The Sun News allows readers to comment on stories as a privilege; the views expressed in story comments are not those of the Sun News or its staff. Readers are required to adhere to all commenting policies, and must avoid commenting behavior such as personal attacks, libelous posts or inappropriate remarks. Users in violation of The Sun News' commenting policies can have their comments blocked, removed, and/or ultimately see their account banned from the site. Some comments may be reprinted in the newspaper. Registered user names will be posted with comments.
The Sun News Terms & Conditions and Commenting Policies can be reviewed here.
   Connect with Us:
Connect with The Sun News on Twitter
Connect with The Sun News on Facebook
Sign up for The Sun News' newsletters, breaking and local news straight to your email inbox
Get up to the minute news from The Sun News Text Alerts.
Get late-breaking Weather News from The Sun News' Weather Text Alerts
Get The Sun News Newspaper online everyday, just as it appears in print
Subscribe too our RSS feeds
Twitter Facebook News
Letters
Text
Alerts
Weather Alerts Daily
E -Edition
RSS
 
Events Calendar:
Career Builder Quick Job Search
Quick Job Search
Top Jobs